Blog Hop, Cards, Fun Stampers Journey

Fun Stampers Journey Blog Hop Outdoor Fun

 

Blog Hop Banner

Welcome back to my blog & the Amazing Journey Blog Hoppers Hop! This month our theme is Outdoor Fun. If you arrived here from Allie’s Blog you are right on track. If not just keep hopping & you’ll come full circle.

Previous-2

Our family has indulged in hiking for a long time. I can’t do it as much as I used to with cranky joints but I enjoy every minute even if it’s easier trails these days. I am originally a Washington State native & like to say I was born in the shadow of Mt. Ranier. It always has been one of my favorite mountains and was the inspiration for this months card.

August-Blog-Hop

 

A lot of the pictures of Mt. Ranier show the mountain shadowed in blues, so I used that for my design cue. The card base is Huckleberry Fusion. I took a Whip Cream panel & colored it with Panpastels for the background. After stamping the mountains from the Climbing Mountains stamp set in Huckleberry Fusion ink, I fussy cut them & colored them with Color Splash pencils. The snowcapped peaks are dusted in Sparkle Dust. The images are layered & popped with Journey Foam Squares onto the background. I stamped the sentiments from Climbing Mountains & Adventure Awaits stamp sets in Black Licorice ink.

I hope this card inspires you to adventure. Your next stop on the hop is Betsye’s blog.

Next-2

Supplies Used:

jm-0079_sm jm-0080_sm jm-0081_sm SS-0322_SM ss-0334_sm jm-0078_sm AC-0013_SMCS-0015_smCS-0040borderedAD-0084_smAD-0085_smAD-0081_smIP-0035_smIP-0041_sm

 

Shop-Here-2

Thanks for stopping by. Stay Tuned for updates on the Sassy AngelS Studio remodel & upcoming classes.

coopersiggy

SASS News, Studio design

Studio Makeover Part 2

Welcome to my blog!

It’s been a busy week trying to get the studio into somewhat of a workable state.

The texture & flat paint on the walls and ceiling made 3 coats of paint necessary for the white paint & only 2/3rd’s of the painting  is complete.

Today we got the floor in & started to arrange furniture. It will be bare bones but I can host Angel Club this Monday, Yay!

Here is the beginning of figuring out the pattern.

Floor-start

There is a story to the flooring. When we thought we were going to get the 1st home we offered on, the studio space was going to be smaller. So I figured I would keep the walls white. Hubby suggested colored tiles for the flooring to add some interest so I ordered the blue & green tiles on sale planning to checkerboard the floor. Then the offer fell through on the house and I still had blue & green tiles.

Then we got this house & a bigger studio space. Somewhere in all my research I fell in love with the Teal color for the accent wall not even thinking about having primary blue & green tiles for the floor. It dawned on me about a week ago that they weren’t going to match. So since I needed more tiles to complete the bigger space, I ordered gray tiles to soften the impact of the blue/green. Don’t think it worked all too well but it’s definitely colorful. We went with foam tiles because it is a garage floor, they are mold/mildew resistant in case there is any water issues, they are easy to clean & easy to replace if for some reason a couple get damaged. Very nice to walk on so far.

I don’t have full pictures for impact yet but this was the last corner of the completed floor. We also removed the old, icky blinds revealing the nice arch of the windows. This is the final wall that needs painted as well as the ceiling above it. Do to space considerations, this wall will also hold the paper cabinets between the 2 windows instead of the opposite wall as originally planned. The brown cabinet at the edge of the photo is my 12 x 12 paper cabinet.

floor-finished

We still needed space for the small freezer & whole house filtration system so I had to move my work area down the back wall a bit. Trying to utilize the space as well as possible isn’t as easy as you’d think. This is a trial placement along with some items that still need homes until the painting is finished. You can see where we removed the blinds on this window & I still need to paint where they were.

Layout-trials

It’s going to be a nice space once I figure everything out, the guys help with a few more things like more lighting & electrical & we finally decide on the garage door/separate entrance. The available wall space to hang/display things will take some thought. I have 2 inkpad units on order, & quite a few other things to figure out.

It may or may not be good news that we are going to Dallas to visit IKEA this week. I could get into more trouble & have to figure out more organization.

Stay tuned for additional updates & a final tour as it nears completion.

Thanks for stopping by!

coopersiggy

 

SASS News, Studio design

Studio Makeover Part 1

Welcome back to my blog!

As many of you know, we embarked on selling our old home earlier this year & tried to find a slice of heaven to call our own, give me a studio to hold classes in & continue our ministry work. After some bumps along the way, that dream came true on July 1st.  Two beautiful wooded acres & room for my studio. (The former owners took the bench & plant pots so I have some landscaping to do.)

5cd28cc94f7bcea16d2faef66bf29228

 

The bumps continued after we moved in. We were hoping to put most of the stuff that didn’t have to be unpacked immediately into the 30 x 40 foot shop on the property & stage it into the house. Well the shop was infested with black & red wasps & hornets. So everything either went into our tiniest bedroom inside the house, it is currently packed floor to ceiling, or into the garage that is becoming my studio. So I was delayed from starting on the studio until we could unpack some & organize more. We actually held Angel Club by email/text/Facebook messaging last month. Progress has been slow but steady & we were finally able to start working on the studio a couple of weeks ago.

Here is an overview of the soon to be Sassy AngelS Studio with the garage door open. (We are parking our cars in the now wasp/hornet free shop.)  The back left corner will host the new whole house filtration system & the baby deep freezer. The nearly 470 remaining square feet will be studio space.

20160808_151418

Most of the furniture you see to one side is part of the studio furniture waiting to be placed in its final location. Before we got to this point, the garage floor was scrubbed, the flourescent light was replaced with a new LED fixture, the water softener (which didn’t work right) was removed to make way for the new whole house filtration system (blue tanks in picture),  old crummy shelves & peg board were removed from the back wall & the air conditioner was set up (so necessary in the Oklahoma heat). This step occurred about 2 weeks ago.

Air-Conditioner

The air conditioner still needs its final insulation & securing & it will be finished but it functions for now. So far nothing in the house is standard, so the guys had to improvise on a support shelf. It works great keeping the space cool & we’ll work on heating solutions in Sept/Oct as it cools down into fall. Fortunately the attic above the garage is spray foam insulated & the guys are going to add some extra loose insulation under the floor boards to help keep the studio more temperature controlled.

Which brings us to the current progress on the studio. Last week my good friend Sue came to help & we got the walls scrubbed down & the first coats of paint on the back & left wall. I got the second coat of Bali Hai Teal (an HGTV dream home color) on the North wall today. So here are the remaining pictures.

20160808_151505

The pipes you see in the left corner are to hook up the filtration system & the freezer will go in that corner. To the far left is the entry into the house where the laundry room is & a large sink to wash up paintbrushes & stencils in.  The remainder of the wall will eventually house my standing work station. It will hold my cutters & die cut machines.

West-Wall

This is the West wall & after its 2nd coat of paint tomorrow will house my giant paper shelves. Still working on a camouflage for the electrical panel & the guys will remove the old phone box & we’ll flat cover it.

East-Wall

This is a peek at the East wall around the studio furniture pile up. As you can see there are 2 nice size windows to let in natural light, one housing the air conditioner. Not quite sure what will go on this wall yet. The plug in the center of the wall is the access to the well pump electrical, so probably nothing heavy & tall. It still needs painted. About 90% of the house was painted in a crappy peachy beige that has an awful yellowish tint in certain light. Yuck! Needless to say, the whole interior of the house will receive fresh paint over the next few months. My custom designed worktop & the classroom tables & chairs will be arranged in the middle of the space.

Walk-Thru-Garage-Door

This is high on my wish list for the studio. It’s a Walk-Thru garage door, fully insulated, additional windows & will give me a dedicated entrance to the studio & still functions as a regular garage door, so no permits from the city needed. We are still figuring out the logistics, it will take 4-6 weeks to get here after ordering & we have to find a local installer for it.

On the schedule for the rest of this week is finishing the paint, laying the floor tiles (I’ll have to order more), setting the paper shelves into place & getting the tables & chairs up for club next Monday. It will be bare bones but I will be able to host club for the 1st time in the new studio. So excited!

Hope you liked this sneak peek into the studio progress. I am working to update the class calendar & will have more studio updates as it takes shape.

Make time to be creative this week!

coopersiggy